In the Barcelona Port enlargement, currently under construction, part of the new quays are
being backfilled with re-used materials such as tunneling waste, rubble from demolitions and dredged soils with poor geotechnical properties. This has resulted in a cost-effective and sustainable construction process that is one of the main goals of the Barcelona Port Authority (APB). A series of control tests have been carried out on the mentioned materials. In addition, dredged soils have been improved by preloading, a
procedure that has been closely monitored by instrumentation.